Steel fixing

Steel Fixing Services

At SCS Bedford, we provide expert steel fixing services to support a wide range of reinforced concrete structures across England. With more than 15 years of experience and over 3,000 successful projects delivered, we are trusted by developers, contractors, and local authorities for delivering strong, safe, and reliable steel reinforcement solutions.

Steel fixing is the essential process of cutting, bending, and tying steel bars and mesh into the correct positions to reinforce concrete structures. Our team of highly trained steel fixers ensures precision and accuracy, guaranteeing that every project meets structural and safety standards.

Why Choose Our Steel Fixing Services?

  • Skilled Workforce – All our steel fixers are professionally trained and experienced in working on projects of all sizes, from small domestic foundations to major commercial builds.

  • Precision & Accuracy – We strictly follow engineering drawings and specifications to ensure correct placement and spacing of reinforcement.

  • Wide Applications – We provide steel fixing for foundations, slabs, beams, columns, retaining walls, staircases, bridges, and complex reinforced concrete structures.

  • Efficient Project Delivery – Our organized approach keeps projects on schedule without compromising quality.

  • Safety & Compliance – Every stage of our steel fixing process complies with UK building regulations and health & safety standards.

Our Steel Fixing Process

At SCS Bedford, we take a structured approach to every steel fixing project:

  1. Preparation & Planning – Reviewing design drawings and structural details.

  2. Cutting & Bending – Using industry-standard tools to prepare steel bars and mesh to required sizes.

  3. Positioning – Accurate placement of steel reinforcement within shuttering/formwork.

  4. Tying & Securing – Fixing steel bars firmly with binding wire to prevent movement during concrete pouring.

  5. Inspection & Approval – Carrying out thorough checks to ensure compliance before concrete placement.

This methodical process ensures reinforced concrete structures are built to withstand long-term loads and stresses.